Our Projects

Bristol
Colston Hall
AEM completed the complex dismantling works at Colton hall, Bristol, a grade II listed building dating back to 1867. Works included complete roof removal, internal brickwork, concrete staircases and large viewing balconies. These were all carefully dismantled around temporary works to help maintain the structure of the hall.
- Visit our Instagram to view a time-lapse of the works.

Brighton
Brighton College Preparatory School
AEM successfully completed a challenging top-down demolition project within a listed building and surrounding structures at Brighton College. Health and safety remained our priority throughout, with careful planning and measures in place to minimise disruption to local residents.
Careful planning, precision and a strong focus on health and safety were key to delivering this specialist project.
- Visit our Instagram to view some BTS.